Roll over image to zoom in
Product Features
Product Overview
Related Videos
Reviews
Questions & Answers
CRL B5T20D6 B5T Series Mill Aluminum 240" Tapered Base Shoe Drilled for 1/2" Glass
Item #: B5T20D6 by CR Laurence
30 Days Easy Return. We are the largest supplier of the most adaptable, personalized hardware in the industry. We work hard to ensure you're satisfied with our products.
- For 1/2" (12 mm) Monolithic Tempered Glass
- Works with TL5X10 TAPER-LOC®'X' Taper S
- Typically Used as the Base Channel for Glass Railing Systems Requiring a Flush Installation Embedded in Concrete
- Drilled and Counter Bored 6" (152 mm) Center-to-Center, or We Will Custom Drill to Your Specifications
- Custom Cutting and Mitering Service
- Test Reports Available
- CRL Glass Railing Systems Meets NBC Load Requirements When Installed in Accordance to ICC-3269
Counter Bore and Depth
7/8 x 1/2 in (22.2 x 12.7 mm)
Center to Center Hole Spacing
6" (152 mm)
Counter Bore X Depth
7/8" (22 mm) x 1/2" (12.7 mm)
Hole Size
9/16" (14.3 mm)
Stock Length
240" (6.10 m)
Holes Drilled C.T.C.
6" (152 mm)
Height With Casters
81" (2.06 m)
Finish
Mill
Material
Aluminum
Length
240
Glazing Thickness
1/2
Glazing Type
Monolithic
Drilling Center to Center
6
Finish/Color
Mill
The CRL B5T Tapered Base Shoe is typically used as the base channel for glass railing systems. It can be clad in six choices of architectural finishes. The most critical component in a railing system is the proper attachment of the Base Shoe to the substrate. CRL has engineered and tested a variety of attachment methods, and has developed an acceptable combination of drilling patterns and fasteners. A printed brochure with instructions, installations hints, cleaning and refinishing techniques is available.
SPECIFICATIONS:
Material: 6063 Aluminum Alloy T52 Temper
Typical Use: Heavy-Duty Tapered Base Shoe for 1/2" (12 mm) glass. Typically used as the base channel for glass railing systems requiring a flush installation embedded in concrete. Also available counter bored and drilled.
Product Warning:
CRL does not recommend direct powder coating of this base shoe extrusion. Powder coated cladding applied over the base shoe is the recommended method.
All pre-drilled CRL Base Shoes have a +1/8 (3mm) / -1/16 (1.5mm) tolerance between each hole drilled in the base. Before drilling installation holes in the concrete or steel substrate it is recommended that the installer place the base shoe into the planned final position, then mark the position of the holes to be drilled into the substrate.
.