Skip to main content
Electric Hinge, 5 Knuckle, (8 Wire, 26/28 Gauge), Long Leads, Concealed Through-Wire, Standard Weight, Steel, 652/US26D Satin Chrome

Roll over image to zoom in

Architectural Control Systems BB1279 4.5X4.5 10B 1108L Electric Hinge, 5 Knuckle, (8 Wire, 26/28 Gauge), Long Leads, Concealed Through-Wire, Standard Weight, Steel, 652/US26D Satin Chrome

Item #: BB1279 4.5X4.5 10B 1108L by Architectural Control Systems

Brand: Architectural Control Systems

See reviewsSee reviews
See reviews summary
In Stock

$133.98

276.00 /each
SAVE UP TO 13.40
Buying in bulk
QUICK SHIPPING*Usually ships in 1 business dayIn stock: 33 units available
QTY
+
+ Add to Wishlist
Buy in Bulk & Save - See HowWatch Now

Shop with Confidence

30 Days Easy Return. We are the largest supplier of the most adaptable, personalized hardware in the industry. We work hard to ensure you're satisfied with our products.

WARNING: This Product May Contain Chemicals Known to the State of California to Cause Cancer or Reproductive Harm. To Learn More Visit P65Warnings.ca.gov
Features

Alternate Part Number-1

242951