Skip to main content
Electric Hinge, 5 Knuckle, (8 Wire, 26/28 Gauge), Long Leads, Concealed Through-Wire, Standard Weight, Steel, 652/US26D Satin Chrome

Roll over image to zoom in

Architectural Control Systems BB1279 4.5X4.5 26D 1108L Electric Hinge, 5 Knuckle, (8 Wire, 26/28 Gauge), Long Leads, Concealed Through-Wire, Standard Weight, Steel, 652/US26D Satin Chrome

Item #: BB1279 4.5X4.5 26D 1108L by Architectural Control Systems

See reviewsSee reviews
See reviews summary

$164.65

/each
SAVE UP TO 16.46
Buying in bulk
Special Order*Usually ships in 1-2 weeks
QTY
+
+ Add to Wishlist
Buy in Bulk & Save - See HowWatch Now

Shop with Confidence

30 Days Easy Return. We are the largest supplier of the most adaptable, personalized hardware in the industry. We work hard to ensure you're satisfied with our products.

Features

Alternate Part Number-1

242955