Skip to main content
Transition Pipe Tee, 1/2 in, Push-to-Connect, DZR Brass, 200 psi Pressure

Roll over image to zoom in

SharkBite UIP363A Transition Pipe Tee, 1/2 in, Push-to-Connect, DZR Brass, 200 psi Pressure

Item #: UIP363A by RELIANCE WORLDWIDE CORPORATION

UPC #: 697285018662

See reviewsSee reviews
In Stock

$21.49

/each
SAVE UP TO 2.15

Buying in bulk

QUICK SHIPPING*Usually ships in 1 business day
QTY
+
+ Add to Wishlist
Buy in Bulk & Save - See How Watch Now

Shop with Confidence

30 Days Easy Return. We are the largest supplier of the most adaptable, personalized hardware in the industry. We work hard to ensure you're satisfied with our products.

Features
  • Instant push-fit connection for increased ease-of-use
  • Easy to disconnect and reusable
  • No primer or glue required

Returnable

Yes

End 1 Type

CTS

ANSI Certified

Yes

Defective Code

A

IAPMO Certified

Yes

Number in Package

1 pk

Maximum Temperature

200

End 2 Type

CTS

Maximum Pressure

200

Packaging Type

Bagged

Push to Connect

Yes

End 1 Diameter

1/2"

Average Lead Content

Lead-Free

Product Type

Slip Tee

Material

DZR Brass

End 2 Diameter

1/2"

Each Weight

0.220 LB

Velocity

X

Hazardous Material

No

Nomenclature

UIP363A TEE 1/2X1/2CTS X1/2PVC

Pressure rating

200 psi

Connection Type

Push-to-Connect

Application

For potable and hydronic heating water distribution

Nominal Size

1/2"

Operating Temperature

200 deg F

Product Overview
TEE SLIP 1/2X1/2CTS X1/2IN PVC
Specifications:

Suitable for: Copper CPVC and PVC (SCH 40 80 and 120) Pipes

The SharkBite PVC transition slip tee allows you to add a line into your existing plumbing system while converting from copper pipe to PVC pipe. The slip feature allows you to cut into an existing copper or CPVC pipe and run out PVC Schedule 40, 80 or 120 from the tee. The white collar center connection fits Schedule 40, 80, 120 PVC and also can be used on IPS CPVC Schedule 40 and 80 pipes. The tan collar ends fit CTS copper, PEX, CPVC or PE-RT pipe. Simply insert the slip coupling onto the pipe and using the PVC depth gauge and disconnect clip to slip the fitting back onto the other end of pipe completing the connection.