Skip to main content
Stub-Out Pipe Elbow, 1/2 in, 90 deg Angle, Brass, 200 psi Pressure

Roll over image to zoom in

SharkBite U351LFA Stub-Out Pipe Elbow, 1/2 in, 90 deg Angle, Brass, 200 psi Pressure

Item #: U351LFA by RELIANCE WORLDWIDE CORPORATION

UPC #: 697285071865

See reviewsSee reviews
In Stock

$19.17

/each
SAVE UP TO 1.92

Buying in bulk

QUICK SHIPPING*Usually ships in 1 business day
QTY
+
+ Add to Wishlist
Buy in Bulk & Save - See How Watch Now

Shop with Confidence

30 Days Easy Return. We are the largest supplier of the most adaptable, personalized hardware in the industry. We work hard to ensure you're satisfied with our products.

Features
  • Compatible with PEX, copper, CPVC, PE-RT and HDPE pipe
  • No special tools, crimping, glue or soldering required
  • Approved for underground and behind-the-wall applications with no access panels (wrapping required when burying underground)
  • Remove using a disconnect clip or disconnect tongs
  • 8 in tube length

Product Type

Pipe Stubout Elbow

Returnable

Yes

Push to Connect

Yes

IAPMO Certified

Yes

Hazardous Material

No

End 1 Type

PTC

End 1 Diameter

1/2"

Each Weight

0.380 LB

Defective Code

A

Average Lead Content

Lead-Free

ANSI Certified

Yes

Packaging Type

Bagged

Number in Package

1 pk

Maximum Temperature

200 °F

Maximum Pressure

200 psi

Length

1.68

Material

Brass

Height

8.13

Width

1.13

Country Origin Code

AU

Application

For portable water

Angle

90 deg

Warranty

25 Years

Operating Temperature

200 deg F

Nominal Size

1/2"

Pressure rating

200 psi

Nomenclature

U351LFA ELBOW STUB-OUT 1/2IN

Velocity

C

Alternative UPC

697285466326

Product Overview
ELBOW STUB-OUT W/8IN TB 1/2IN
Specifications:

Application: For portable water

Warranty: 25 Years

Material: Brass

Suitable for: PEX Copper CPVC PE-RT and HDPE Pipes

Stub-out elbow used during rough-in plumbing phase to enable a fixture to be installed after the drywall is completed and painted. Innovative push-to-connect design makes for quick and easy installation during rough-in to enable a fixture to be installed after the drywall is completed and painted. Simply cut the stub-out and attach the necessary supply stop to finish the installation.