Skip to main content
1-1/2 In. MPT x 1-1/4 In. FPT Schedule 80 Reducing PVC Bushing

Roll over image to zoom in

Charlotte Pipe PVC 08200 3800HA 1-1/2 In. MPT x 1-1/4 In. FPT Schedule 80 Reducing PVC Bushing

Item #: PVC 08200 3800HA by Charlotte Pipe and Foundry Company

UPC #: 00611942078578

See reviewsSee reviews
See reviews summary
In Stock

$4.60

/each
SAVE UP TO 0.46
Buying in bulk
QUICK SHIPPING*Usually ships in 1 business dayIn stock: 20 units available
QTY
+
+ Add to Wishlist
Buy in Bulk & Save - See HowWatch Now

Shop with Confidence

30 Days Easy Return. We are the largest supplier of the most adaptable, personalized hardware in the industry. We work hard to ensure you're satisfied with our products.

Features
  • Conforms to standards: ASTM D 1784, ASTM D 2467. ASTM D 2464, ASTM F 1970 and NSF 14 and NSF 61
  • PVC schedule 80 is highly durable, with high tensile and impact strength, commonly used in industrial applications
  • PVC schedule 80 fittings are for pressure applications
  • Maximum working temperature of 140 F
  • Require no special tools for cutting and to be installed with solvent cement

Material

PVC

Fitting Type

Bushing

Schedule

80

Connection Type 2

FPT

Connection Type 1

MPT

Fitting Size 1

1-1/2 In.

Fitting Size 2

1-1/4 In.

Product Overview
PVC Schedule 80 is highly durable, with high tensile and impact strength, commonly used in industrial applications. PVC Schedule 80 fittings are for pressure applications. Maximum working temperature of 140 F. Requires no special tools for cutting and to be installed with solvent cement. Conforms to standards: ASTM D 1784, ASTM D 2467, ASTM D 2464, ASTM F 1970 and NSF 14 and NSF 61.